Entries by logistikprojekt

Implementation of the Warehouse and Transport Management System

The customer had decided to change its ERP system in the future. To secure the distribution process, they decided to implement a WMS and a TMS. The implementation of the WMS resulted in a paperless picking process with increased efficiency and reduced picking errors. Through automatic consolidation and freight booking in the TMS, the customer increased delivery accuracy and reduced freight costs.

Relocation of assembly and storage during COVID-19

The customer needed help with moving assembly and warehousing from northern Sweden to central Europe to achieve shorter lead times to their customers and streamline operations. After developing a concrete project plan with a specified budget and clear division of responsibilities, we were able to work with the customer to implement a factory relocation and change of ERP system within 9 months. The project was carried out during [...]

INTEGRATION OF SYSTEMS FOR DISTRIBUTOR

In this project, our consultant worked as Integration Manager. The assignment consisted of integrating different box and pallet handling systems with a WMS, as well as integrating them with each other for a new distribution warehouse. The project consisted of four different subsystems - pallet cranes, light goods cranes, pallet tracks and light goods tracks. All with associated control system and superior WMS. Within the various subsystems there were functions […]

100% INCREASED CAPACITY WITH SOLUTION THAT WAS INSTALLED WITHOUT INTERRUPTION IN PRODUCTION

The storage warehouse of a customer in Central Sweden needed to be renewed. The challenge was that the warehouse supplied all production lines with materials, which meant that the rebuilding had to be done so that the business was affected as little as possible. After completing the pilot study, it was decided to replace the existing layout consisting of shuttle solution in front of the cranes, with a conveyor loop and new conveyor control.

56% FEWER PICKING HOURS IN BUFAB'S MANUAL WAREHOUSE

Bufab France needed to develop its manual warehouse of 5200 m2 where all customer orders were picked from traditional pallet racking. Logistik & Projekt was commissioned to do a preliminary study on introducing Shelf-rack and Flow-rack, with picking controlled from WMS and PDAs. During the course of the mission, the solution changed to make most of all picking from […]